top of page


30 March 2023:
Sign Reassembly for the
Kai Choi School Annex Block
As villagers and visitors looked on, the Kuk Po Vision team reassembled the broken sign that sat formerly atop the Kai Choi School Annex Block. As the sign was made of brick covered in concrete, its pieces were heavy and very difficult to move around. Yet, the team’s resilience eventually paid off, and the sign’s reassembly was completed in a number of houses. The newest appearance of the reassembled sign was then documented through the use of a 3D-Scanning software.






bottom of page